Short answer: in an IT system the source star point is not connected to earth, or is connected through a high impedance, and equipment enclosures are connected to a local earth electrode. If one phase touches an enclosure or earth, the fault current is very small and the supply stays on, but an insulation monitoring device (IMD) reports the fault so that it can be cleared before a second fault occurs. IT is for places where a sudden loss of power is more dangerous than continuing to run.
How an IT System Is Built
The source of an IT system is usually an isolating transformer or a dedicated generator. Enclosures, individually or in groups, connect to a shared earth electrode and earth bar. Distributing the neutral is not recommended in IT, and most designs run the phases only.
First Fault and Second Fault
- First fault: the fault current returns only through the capacitance of the cables and the source impedance, so it is small. Under IEC 60364-4-41 the condition RA × Id ≤ 50 V must be met so that the voltage on enclosures does not become dangerous; Id is the first-fault current. Where IT is used for continuity of supply, an insulation monitoring device is mandatory to report the first fault.
- Second fault: if another phase reaches an enclosure before the first fault is cleared, a phase-to-phase short circuit forms through the enclosures and must be disconnected, as in TN or TT, by a circuit breaker, fuse or residual current device.
Without monitoring and a quick response to alarms, an IT system loses its advantage.
Where IT Systems Are Used
- Operating theatres and intensive care: for group 2 medical locations such as operating theatres, IEC 60364-7-710 requires a medical IT system with an isolating transformer and insulation monitoring device.
- Process industries and mining: where a sudden stop of a production line or ventilation is dangerous or costly.
- Ships and some emergency installations: to keep running after the first fault.
Advantages and Drawbacks of IT Systems
- Advantage: continuity of supply after the first fault, and a small first-fault current.
- Drawback: it needs an insulation monitoring device, trained staff to locate faults and a more complex design, and the healthy phases see a higher voltage to earth during a first fault. Equipment insulation and surge protective devices must therefore be selected for the IT voltage.
Where IT Sits Among the Earthing Systems
Each system's name has two or three letters. The first letter says how the source (the transformer star point) relates to earth: T means directly earthed, and I means isolated from earth or earthed through a high impedance. The second letter says where the metal enclosures of equipment connect: N means to the earthed point of the source through a protective conductor, and T means to the site's own earth electrode. A third letter appears only in the TN family: S means neutral and protective conductor are separate, and C means both share one conductor, called PEN.
System | Neutral and protective conductor | Protection against electric shock | Where you find it |
|---|---|---|---|
Separate from source to load | Circuit breaker or fuse, with Zs × Ia ≤ U0 | Factories and large buildings with their own substation | |
One PEN conductor | Circuit breaker or fuse; a residual current device will not work | Distribution networks and older installations | |
PEN up to the intake, then separate | Circuit breaker or fuse, plus a residual current device after the split point | Most buildings fed from the public network | |
Neutral from the network; protective conductor to the site electrode | Residual current device, with RA × IΔn ≤ 50 V | Buildings and installations far from the network or on a separate earth | |
IT | Source isolated from earth; enclosures on the site electrode | Insulation monitoring for the first fault, disconnection on the second | Operating theatres, mines and industries where sudden loss of power is not acceptable |
For an overview, see types of earthing systems and what an earthing system is.
At KALOT Group we carry out earthing and bonding design and earthing system measurement and testing, and we offer the components, from copper-bonded earth rods and earth bars to green and yellow earth conductors and polyethylene inspection pits. To choose the right system, send our engineers your single-line diagram and supply type, or get in touch through our contact page.