Lightning protection and earthing for towers and tall buildings

The earthing and lightning protection system of a tower is built in seven stages, and the first two can no longer be seen or corrected once the concrete is poured. If the foundation electrode does not reach the soil or the reinforcing bars are not continuous, no amount of money can fully fix it later. We have worked alongside builders on more than 200 towers and residential, office and commercial complexes, from Milad Tower to residential complexes in Tehran, Tabriz, Shiraz and Mashhad.

What goes under the concrete gets only one chance to be done right.

Simple section of a tower with a ring earth electrode under the foundation, down conductors on both sides, the facade and a rooftop air terminal

Seven stages of construction

Excavation and foundations

A foundation electrode that never reaches the soilCannot be fixed later

The problem

Waterproofed foundations, perimeter insulation and sub-base layers separate the electrode in the concrete from the soil. In this case, the usual practice is a ring electrode outside the insulation, with a tighter mesh than normal.

Our answer:
Earthing design before the concrete pour, a ring earth electrode joined with KALweld® exothermic welding, and measurement before backfilling.
Structural frame

Reinforcing bars with unproven continuityCannot be fixed later

The problem

Structural reinforcing bars count as a down conductor only when their continuity has been measured. Tests have shown that a poor joint between two bars causes serious damage to the concrete under lightning current. Tie wire connections are not suitable for this purpose.

Our answer:
Welded connection points or welded joints to reinforcing bars, a dedicated bonding conductor, and continuity testing every few floors.
Facade

Side flashes

The problem

Tall structures are not struck only on the roof. The upper part of the facade is exposed too. In two incidents in Chicago, lightning tore off part of a building's facade and the pieces fell into the street. Metal frames of glass facades raise this risk if they are not continuously bonded.

Our answer:
Bonding of the metal facade frames to the down conductors, and side air terminals on the upper part of the facade.
Roof

A roof crowded with equipment

The problem

Antennas, air conditioning units, facade cleaning machines and solar panels on the roof leave little room to keep the separation distance. The result is uncontrolled flashover to the building's electrical installations.

Our answer:
Separation distance calculation, conventional air rods and bases, and for solar panels, photovoltaic system surge protective devices (SPDs).
Handover

Handover without a report

The problem

A building handed over without a test report has no baseline for comparison in later years.

Our answer:
Earthing system testing and continuity testing with a written report.
Operation

The forgotten building

The problem

The standards place office, commercial and crowded buildings in a group that requires a full annual inspection. Building boards usually do not attend to it until the day of an incident.

Our answer:
A periodic inspection contract for building management.

References: IEC 62305-2 to 4 (2024 edition), DIN 18014, BS 7430, IEC 61643

Some of our projects

Landmarks and major towers: Milad Tower, Bagh-e Misheh residential towers in Tabriz, the 13-storey twin complexes in Zafaranieh, the 13-storey office and commercial complex at Shiraz Science and Technology Park, the 12-storey IRIB residential complex

Residential towns and complexes: Shahid Beheshti town, the fighter pilots' complexes, the 198-unit Safaieh complex in Yazd, the Teachers' and Engineers' complexes in Shiraz, the Housing and Urban Development complex in Mashhad, the Nar welfare complex in Assaluyeh

Office and commercial: Valiasr commercial complex, Abbasabad office and commercial complex, Bucharest complex, and buildings in Gholhak, Elahieh, Farmanieh and Velenjak

What to send for design and a quotation

Current construction stage, the foundation drawing and its waterproofing type, height and type of facade, rooftop equipment, and, if the building is in use, the latest test report.

Frequently Asked Questions

When should foundation earthing be installed?

Before the foundation concrete is poured. After that, the electrode inside the concrete is out of reach and cannot be corrected.

Can a building's reinforcement serve as the lightning protection down conductor?

Yes, provided the reinforcing bars are properly connected and their continuity from top to bottom is measured and recorded.

Does a tall building only need an air terminal on the roof?

No. The upper part of a tall tower's body is also exposed to lightning, so the facade must be bonded. The building services inside also need surge protective devices.