university and school lightning protection and earthing

A university campus is a small town: open sports grounds, solvent laboratories, a data centre, crowded dormitories and older buildings whose lightning protection nobody has checked for years. Budgets are usually tight too. So the key question is where to start. We have worked alongside technical managers at more than 40 universities, faculties, libraries and research centres, from Sharif University of Technology and Amirkabir to universities in Hamadan, Mashhad and Zahedan.

Campus map and risk matrix

Simple campus plan with seven high-risk points: sports field, laboratory, data centre, dormitory, old building, auditorium and teaching building with solar panels
Likelihood / consequenceLowMediumHigh
High7 Solar panels3 Data centre1 Sports field
Medium2 Laboratory4 Dormitory · 6 Hall
Low5 Old building

Seven points, seven needs

1Sports field

The problem

Most lightning injuries at schools worldwide have happened on the sports field while pupils were being moved, when the decision to go indoors came too late. In one country's statistics, football accounted for the most lightning deaths in sport.

Our answer:
A shelter protected by air terminals, and help drawing up the warning and evacuation procedure.

2Laboratory

The problem

Pouring solvent from an unbonded metal container has caused sparks and fires. Gas and water pipes and sinks must be bonded too.

Our answer:
Laboratory earth bars, bonding points and continuity testing.

3Data centre

The problem

When the central server fails, telephones, internet, fire alarm and enrolment across the whole university go down together. Unbonded racks are the first casualties.

Our answer:
Telecommunications bonding busbar, rack bonding and data surge protective devices.

4Dormitory

The problem

A crowded building that is full at night. In reports from several countries, lightning striking a dormitory roof has started real fires.

Our answer:
Risk assessment weighted for the number of occupants, air terminals and fire alarm surge protective devices (SPDs).

5Old building

The problem

Corroded copper tape, joints between dissimilar metals and no test points. Appearance constraints also make it harder to choose conductor routes.

Our answer:
Survey and testing, and a refurbishment design with discreet routes, based on the risk assessment and the character of the building.

6Assembly and sports halls

The problem

For crowded buildings, the standards apply a higher risk weighting because of the danger of panic and crushing.

Our answer:
Protection system design at the right protection level, with annual inspection.

References: IEC 62305-2:2024, IEC 62793, IEC 62305-3 and 4, ANSI/TIA-607, IEC 60364-5-54

On a limited budget, where do we start?

  1. Stage 1 · Low costAssessment

    Earthing system testing, a survey of existing air terminals, a list of high-risk points and a risk assessment.

  2. Stage 2 · Quick impactUrgent work

    SPDs for the data centre and fire alarm, repair of corroded connections and a procedure for the sports field.

  3. Stage 3 · PlannedCompletion

    Full lightning protection for the buildings in order of risk, and a periodic inspection contract.

Some of our projects

Universities: Amirkabir, Iran University of Science and Technology, Alzahra, Bu-Ali Sina Hamadan, Mashhad University, Shahid Abbaspour, Malek Ashtar, K. N. Toosi, Tehran, Zahedan and Alborz Universities of Medical Sciences, Urmia, Lorestan Economic and Administrative Sciences

Shahid Beheshti University: the mathematics building, the Faculty of Architecture, the Faculty of New Technologies, Nuclear Radiation Applications, the married students' dormitory

Sharif University of Technology: the physics research institute and faculty

Libraries and data centres: the University of Isfahan central library, the Iran University of Science and Technology library, the Science and Research Branch library servers, the Faculty of Aerospace computer centre

Islamic Azad University: Science and Research, Tehran North, Sadra, Saveh and Amol branches

What to send for design and a quotation

Campus plan with building uses, the number of dormitory residents, the location of the data centre and laboratories, the construction year of older buildings, and any previous test reports.

Frequently Asked Questions

Does a small school or university need lightning protection?

It depends on the risk assessment: height, location, number of occupants and the local lightning density. Heavily occupied buildings carry more weight in the assessment.

Where do we start on a tight budget?

Start by testing and understanding the current condition. Very often, repairing joints and installing surge protective devices at a few critical points removes the most risk for the least cost.

What should we do with students in the schoolyard during a thunderstorm?

Before the storm gets close, bring everyone indoors and stay inside until some time after the last lightning strike. A written procedure and a named person in charge make that decision quick.