Earthing, Lightning Protection and SPD Installation
At KALOT Group we install earthing, lightning protection and SPD systems to the approved drawings and specifications, the applicable standards and the manufacturers’ instructions. Our focus on site is the electrical continuity of protective paths, the quality of connections, mechanical strength and durability, and making sure the finished system meets the safety and performance requirements of the design.
Our earthing, lightning protection and SPD installation services
- Document review and preparation: We review the drawings against actual site conditions and check that materials, equipment and their technical documents meet the approved project requirements and the relevant product standards. Before work starts, we coordinate with other disciplines and refer any discrepancies or proposed changes for technical review and approval.
- Earthing and bonding installation: We install electrodes and earth grids, protective conductors and earth bars, and bond the conductive parts covered by the design. Welded or mechanical connections are made to suit the job, with attention to electrical continuity, material compatibility and corrosion protection.
- Lightning protection installation: We install air terminals and their supports, run the down conductors and test joints, and connect them to the earth termination system. Separation distances, lightning bonding and measures to reduce the danger of touch and step voltages all follow the design.
- SPD installation and connection: We install SPDs for power, data and control circuits in the approved position and arrangement. Conductor length, routing and cross-section, bonding, separation of protected and unprotected wiring, and any backup protection all follow the manufacturer’s instructions.
- Quality control and initial testing: We inspect connections and buried components before they are covered or concreted, and check the mechanical fixing of components and the correct installation of SPDs. Continuity tests, earth resistance or impedance measurements and checks on electrical protection are carried out to suit the system, the supply arrangement and the project scope, and any defects are put right before handover.
- Documentation and handover: We prepare as-built drawings, records and photographs of components before they are covered, and test reports with results assessed against the project acceptance criteria. We also hand over operation, inspection and maintenance instructions, together with the technical documents for the materials and equipment installed.
Related articles and services
After installation, earthing system testing and periodic inspection and maintenance keep the system performing as it should.
You will find what the job needs in our earthing and bonding products, lightning protection products, surge arresters and overvoltage protection and exothermic welding and connections. Press the “Request a Technical Consultation” button and our engineers will contact you to discuss your project.
Have a Technical Question?
KALOT Group's technical experts are ready to answer your questions about lightning rods and earthing systems.