Earthing for substations and power plants: step and touch voltage
In substations and power plants, an earthing system is not built just to be "connected". At the moment of a fault, when tens of kiloamperes flow into the ground, the voltage under the feet of anyone standing next to the equipment or the fence must stay tolerable. In August 2019, a lightning strike on a transmission line in Great Britain, cleared in the normal way, led to two power stations disconnecting and more than one million customers losing power. We have worked alongside clients in substations, dam control buildings, dispatch centres and power distribution companies.
The journey of an earth fault
Follow an earth fault in the substation yard from the moment it happens.
- Moment zeroA fault in the yard
Fault current flows through the earthing grid into the soil and the potential of the whole substation rises.
- Beside the equipmentStep and touch voltage
Anyone touching equipment or walking across the yard bridges the voltage difference with their body.
- At the fenceDanger to people outside
If the fence is not properly earthed, it is dangerous even to passers-by outside the substation.
- Beyond the substationTransferred potential
Cable sheaths, pipes, rails and telecom pairs carry the high potential kilometres away.
- Inside the buildingControl room
Relays, SCADA and telecoms are damaged by surges and potential differences, or issue false commands.
- Our answerAt every step
Soil resistivity measurement and earthing grid design with step and touch voltage calculations, surface gravel across the yard, fence earthing, isolation or bonding of outgoing services, and a bonding ring with SPDs in the control building.
Risk map
Red: high risk · Amber: medium risk · Grey: low risk
| Building services | Step and touch voltage | Direct strike | Transferred potential | Surge and interference | Corrosion and theft |
|---|---|---|---|---|---|
| HV substation yard | |||||
| Power plant | |||||
| Transmission tower | |||||
| Control and relay building | |||||
| Telecoms and dispatching |
Qualitative assessment based on common industry practice. References: IEEE 80, IEEE 81, IEEE 367 and 487, IEEE 998, IEEE 837, EN 50522, IEC 61000-6-5, IEC 62305-4
The four weak points we see most often on site visits
Wrong measurement: In cramped substations the fall-of-potential test is often run with too little electrode spacing and gives an optimistic figure. We carry out earthing system testing with a method that fits the substation's dimensions.
Corroded connections: The earthing grid is out of sight underground and its bolted joints slowly rot away. KALweld® exothermic welding fixes this weakness.
Tower footing resistance: High footing resistance at transmission towers is the main cause of back-flashover. Earth rods, counterpoise and GIM ground improvement material help, but on their own they are not enough for very severe lightning strikes.
Copper conductor theft: A substation whose earth conductor has been stolen is dangerous for staff and even for passers-by outside the fence. An inspection after every theft is essential.
The life cycle of an earthing system
Every substation expansion, from one added feeder to a new building, changes the fault current. The earthing design must be updated with it.
- Soil survey and design
- Installation
- Acceptance testing
- Periodic testing
- Refurbishment and expansion
Some of our projects
The Maroun power plant substation, the Shahid Rajaee power plant tower, the control building in the body of Seymareh Dam, the Karkheh Dam administration building, the Shahriar headquarters and dispatching building of Azarbaijan Regional Electric Company, the Kuh-e Genu repeater of Hormozgan Regional Electric Company, the Zanjan, Kermanshah and Mashhad power distribution companies, and the Nuclear Power Plant Engineering and Construction Company at Khondab, Arak.
What to send for design and a quotation
Single-phase short-circuit current and fault clearing time, the substation or power plant layout, the dimensions of the site and its fence, soil measurement results, and the routes of cables and pipes leaving the substation.
Frequently Asked Questions
Is low earth resistance enough to make a substation safe?
Not on its own. The safety criterion is the step and touch voltage at the moment of a fault, which depends on the fault current, its clearing time, the earth grid layout and the surface layer of the yard.
What is the benefit of gravelling a substation yard?
A high-resistivity surface layer reduces the current passing through the body and raises the permissible step and touch voltage limits.
Why should a substation be reassessed after an extension?
Because adding equipment or changing the network alters the fault current and the paths by which potential is transferred, so the earlier design may no longer be adequate.
Have a Technical Question?